KEK e+/e- Linac Trigger Timing Information
[Old Page]
Recent Information
Signal Connection Diagram
Main Trigger Station schem
Main Trigger Station
2021/11/10 ~
~ 2021/11/10 ~
~ 2021/09/30
~ 2021/09/17
~ 2021/05/06
~ 2021/04/14
~ 2021/01/06
~ 2020/09/14
~ 2020/01/22
2019/09/17 ~
~ 2019/05/30
~ 2019/05/29
~ 2018/11/07
~ 2018/05/07
~ 2018/01/30
~ 2018/01/10
~ 2017/11/20
~ 2017/03/28
~ 2017/01/13
~ 2016/09/16
~ 2016/04/01
~ 2016/02/12
~ 2016/02/02
~ 2016/01/18
~ 2015/11/24
~ 2015/11
~ 2015/05
~ 2015/03
~ 2014/10
~ 2013/08
~ 2013/07
~ 2013/03
~ 2012/12
~ 2012/07
~ 2012/06
~ 2011
~ 2010
~ 2007
~ 2001
~ 1999
GU_AT HV-ST
2016/09 ~
~ 2016/09
ABC Sub Control Room
Sub booster
Cable Connections
Rack Configuration
Main Trigger Station Rack1
ABC Sub-control
Timing Synchronization Circuit Diagram and
Memo for PF Ring (Sep.2005)
Timing Signals to PF Ring
Timing Signal to Pulse Coil FP_21_T
Linac Trigger Database
Linac Camac Module List
[Please Comment on This Page]
<[email protected]> , Linac, KEK,
Oct.20.2000 - Dec.11.2005.
[ Timing Another ]
[ Control ]
[ Linac ]
[ Accelerator ]
[ KEK ]