Welcome to KEK e+/e- Linac

KEK e+/e- Linac injects 8GeV electrons and 3.5 GeV positrons to the KEKB (B-Factory) ring. It also provides 2.5 GeV positrons / electrons to PF (Photon Factory) and PF-AR. The slow positron facility in Linac is being upgraded. The picture on the right shows the beam switch yard at the end of 600m-long Linac.

Japanese Page


IUC (Injector Upgrade Committee)

Linac Information

KEKB Linac Commissioning Group

Control Group

RF Group

Operation Group

Slow Positron Facility

Experiment on Positron Production with Crystal

Mail Archives

Linac Reports

Linac Seminar

Linac Computer Environments

User Pages

Miscellaneous Pages


Other Web Servers

Accelerators:   [ KEKB Ring 1 ]  [ KEKB Ring 2 ]  [ PF Ring ]  [ ILC ]   [ J-PARC ]  [ KEK Accelerators ]  [ Accel-J ] 
Detectors:   [ KEKB Belle ]   [ JLC ]   [ ATLAS ]   [ Other Projects ]
Lab. Home:   [ KEK ] [ KEK-J ] [ KEK-Comp/Net ] [ KEK-Libr ]
Linac:   [ Linac Primary ]   [ Linac Secondary ]   [ Linac Tertiary ]
High Energy Accelerator Research Orgnization (KEK)
Disclaimer and Copyright Notice of KEK Web Pages
[Please Comment on This Server]
<[email protected]> , Linac, KEK, May.2.1994. - Mar.27.2005.