SuperKEKB Design Report


  1. Physics Motivation (Jun.2014)
  2. Overview (Sep.2019)
  3. Beam Dynamics (Sep.2019)
  4. Lattice Design (Oct.2020)
  5. IR Design (Oct.2020)
  6. RF System (Oct.2020)
  7. Magnet System (Oct.2020)
  8. Vacuum System (Oct.2020)
  9. Beam Instrumentation (Oct.2020)
  10. Beam Transport (Oct.2020)
  11. Injector Linac (Oct.2020)
  12. Damping Ring (Oct.2020)
  13. Accelerator Control System (Oct.2020)
  14. Safety System (Oct.2020)
These files are latest as of Oct.2021.



Y. Funakoshi, K. Furukawa, SuperKEKB Commissioning Group, KEK
Kazuro Furukawa <[email protected]> , Oct.28.2020 - Nov.20.2023.
[SuperKEKB]  [Linac]  [Linac-Com]  [Accelerator]  [Belle2]  [KEK]